References

Our references

Mobilization

Mobilization of various Equipment

Upgrade

Various Upgrades on Loading System

Mobilization

Various Sea Fastening jobs

Demob and Mob

Deme Offshore

Relocation

Transition Piece

Mobilization

Sea Fastening

Prefabrication

Sea Fastening

Prefabrication

Boat Landing

Demobilization

Deme Offshore Structures

Construction

Sheet Pile Corners

Mobilization of Wind Osprey

Root End Structures

Mobilization of Wind Osprey

Sea Fastening Structures

Demobilization of Wind Osprey

Barbecue dinner

Demobilization of Wind Osprey

Structures from the Seagreen Project

Prefabrication

Leg Guide Extractor

Prefabrication and mobilization

Substructures for Root- and Tip End Blade Rack

Prefabrication and mobilization

Substructure for Tip End Blade Rack

Prefabrication and Mobilization

Tower Grillages

Prefabrication and mobilization

Various Sea Fastening

Prefabrication and mobilization

Various Sea Fastening

Surface Treatment

Sandblasting, priming and paint.

Prefabrication

Aluminium Stairs

Prefabrication and mobilization

Various Sea Fastening

Construction

ROTOR FOR STRIKE-BAR CRUSHER

Prefabrication and Mobilization

Sea Fastening – Adapter Flanges

Onsite assistance

Onsite assistance on the Baltic Pipe Project

Prefabrication

Prefabrication for the Baltic Pipe Project

Prefabrication

Installation of crane

Prefabrication and Mobilization

Various Sea Fastening for Ocean Zephyr

Prefabrication

Stairs and Gangways