Prefabrication and mobilization

Substructures for Root- and Tip End Blade Rack

For the 650 tons Sea Fastening job for Wind Orca, the bottom Pipe-structure and secondary steel parts have been painted in our Paint shop, and in our workshop, there is already a good progress of installing the secondary steel on both the Root- and Tip End Blade Rack substructures.

The job is carried out for Cadeler A/S.

Scroll to Top