Prefabrication and mobilization

Substructure for Tip End Blade Rack

For the 650 tons sea fastening job for Wind Orca, the bottom part of the tip end blade rack is on the way from Trafikhavnskaj to Sperlingvej for further assembly.

The job is carried out for Cadeler A/S.

Scroll to Top