Accommodation unit and Moon pool
Prefabrication and fitting of an accommodation unit, Cargo Rail and Moon pool plus fitting for an A-Frame with maximum load on 250 tons for M/V “MAERSK ACHIEVER”. The job was carried out for FAYARD A/S.