Prefabrication and fitting of a steel unit for a 3.5 meter lengthening, new steel deck from fr. 7 til fr. 16, increase of bulwark, new railing, 2 new aluminium bulkheads on working deck and a new bow from Fr. 30 and forward, in connection with the conversion and lengthening of M/TRW “JEANNE”. The job was carried out for Strandby Værft og Bedding.