Lenghtening

M/TRW. “FLIPPER”

Prefabrication of steel units for a 3.65 meter lenghtening of M/TRW “FLIPPER”. The job was carried out for HANSTHOLM NY FLYDEDOK A/S. Approximately 14.5 tons of steel was used.

Scroll to Top