Conversion of the aft ship
Prefabrication and fitting of steel for conversion the aft ship on M/T “NAUTILUS”, M/T “NEPTUNUS” and M/T “NIMBUS”. The job was carried out for FAYARD A/S. Approximately 105 tons steel was used for the project.