On the vessel Boulder, we have carried out a small demobilization at Tampen Quay in Esbjerg. We assisted the vessel crew cutting loose several large winches and spooling gears, and delivered all the lifting equipment, lifting plans and crane used for lifting the equipment from the vessel and directly into our own storage area. The job was carried out for JD Contractor.