Baseplates and Breakwater

Jack-up rig “Wind”

Nicon Industries A/S has since 2007 carried out the following prefabrication- and fitting jobs on the Jack-up Vessel “WIND”:

Prefabrication and fitting of a crane foundation, bulwark and store-room. The job was carried out for ORSKOV YARD A/S.

Prefabrication and lengthening of pipes for 4 Jacking legs. The job was carried out for Dansk Bjærning og Bugsering.

Prefabrication of new accommodation units plus a Breakwater. The job was carried out for ORSKOV YARD A/S.

Prefabrication of new Base plates for the Jacking legs. The job was carried out for ORSKOV YARD A/S

Scroll to Top