Prefabrication and fitting of a wide range of steel tasks on the Jack-up Rig “MAERSK GUARDIAN” during the Yard Stay in Hirtshals. The tasks, carried out for FAYARD A/S, reached from simple replacement of steel plates and profiles to large complex constructions. More than 300 tons steel was used on this project.
Tasks that can be mentioned:
- Replacement of Tank top in Aux. room.
- Replacement of plates and profiles in tanks.
- 2 Texas Decks inclusive foundations for Lifting Set and Skidding System.
- 2 Foldable Decks inclusive Deck Fastening
- 4 Riser Tension brackets and swivel parts.
- Upgrade of BOP cranes.
- Diverter gangway.
- Windwall
- Service rails.