Mobilization and thereafter demobilization onboard JACK-UP VESSEL “BRAVE TERN”. Mounting and demounting of seafastening and container locks as well as anemometer on the crane. The job was carried out in The Netherlands for FRED. OLSEN WINDCARRIER A/S.
Prefabrication of cable chute for JACK-UP VESSEL “BRAVE TERN”. The job was carried out for ORSKOV YARD A/S.